top of page
For a long lasting tile installation, every steps counts.
Mitered metro tiles shelf and niche.
Installing 5x15 cm Handmade Moroccan terracotta brick tiles.
Lily Pad Bubblegum mitred niche.
Lily Pad Bubblegum mitred corner.
600x300 porcelain bathroom tiles.
Set of diamond pads for tile edge finishing and polishing.
Mitred external corners filled and polished with resin.
Envelope cuts on a wet shower tray.
Waterproofing a wet room.
Installing large format tiles 600x1200.
Ensuring the tiles are staying straight and square.
Central grout line and working my way out.
Back buttering to ensure the tile has 100% coverage.
Laser line on handmade Zellige tiles.
Diamond pads for edge and side finishing.
Mini metro gloss white bevel brick wall tile.
Soaking in water highly porous ceramic metro tiles before installation.
Laser line still show on top of the adhesive, never loose tile line to follow.
Obtaining the required adhesive coverage.
Replacing floor tiles.
Finished floor tile installation.
Replacing damaged section of plasterboard.
Fully waterproofed shower enclosure.
Shrinkage or expansion will cause stress, uncoupling membrane is used.
Silicone finish between tiles and worktop.
bottom of page